亚洲欧美日本韩国_久久久久亚洲AV片无码V_亚洲AV片不卡无码一_H漫全彩纯肉无码网站

 
 
當前位置: 首頁 » 新聞資訊 » 廠商 » 正文

GMW15919油漆附著力熱沖擊試驗標準_91化工儀器網(wǎng)

分享到:
放大字體  縮小字體    發(fā)布日期:2019-09-02  來源:儀器信息網(wǎng)  作者:Mr liao  瀏覽次數(shù):528
核心提示:1 ScopeThis procedure is used to determine the resistanceto coating adhesion loss of coated surfaces ofaluminum, plastic, steel, and other substrates when subjected to a wet steam blast similar to thatproduced by vehicle wash equipment.Note: Nothing in th






 

 


1 Scope
This procedure is used to determine the resistanceto coating adhesion loss of coated surfaces ofaluminum, plastic, steel, and other substrates when subjected to a wet steam blast similar to thatproduced by vehicle wash equipment.
Note:  Nothing in this standard supersedesapplicable laws and regulations.
Note: In the event of conflict between the English
and domestic language, the English language shall take precedence.
1.1 Purpose. To determine the resistance to coating adhesion loss of coated surfaces of aluminum, plastic, steel, and other substrates when subjected to a wet steam blast similar to that produced by vehicle wash equipment.
1.2 Foreword. Not applicable.
1.3 Applicability. Painted exterior components of vehicle.
2 References
Note: only the latest approved standards are applicable unless otherwise specified.
2.1 External Standards/Specifications.ISO 2808
2.2 GM Standards/Specifications.
3 Resources
3.1 Facilities. Not applicable.
3.2 Equipment.
3.2.1 Test Equipment and Material.
3.2.1.1 Scribe Tool. A straight-shank tungsten carbide tip, lathe cutting tool or carbide-tipped pencil type tool with tip angle of 60 15 degrees or equivalent.
3.2.1.2 Razor blade.
3.2.1.3 Water Bath. Water bath at 38 2 C temperature with 5 ppm maximum dissolved solids as measured utilizing a suitable dissolved solids meter.

3.2.1.4 Freezer capable of maintaining -29 3 C temperature.
3.2.1.5 Steam generator.
Note: Model 100 (and the earlier Model 60) steam generator (from Atomic Steam Co., 10727 Fendell, Detroit MI 48238) has been found to be satisfactory. Milwaukee 1.27 cm ( 1 / 2 in) globe valve 1151 to 1161, 150 Steam Working Pressure,
300 Water-Oil-Gas,  is  adequate  for  use  in standardization of generator.
3.2.1.5.1 Input Flow of Water. 2.7 L/minute with a deviation less than 5% (3.2.1.5.1.1).
3.2.1.5.1.1 Model 100 Steam Generator. The pumping pressure is directly related to the input flow rate. The pressure needed for the required flow can be determined by measuring the pump pressure and discharge flow rate with the burner off. When the burner is turned on, the required flow rate is obtained by readjusting to the required
pump pressure.
3.2.1.5.2 Nozzle Diameter. 12.5 mm ID within 2% and at least 100 mm long.
3.2.1.5.3 Discharge Dynamic Head. 37.9 kPa within 5% measured 25 mm from the nozzle using a 47 mm ID tube. A nondiverging discharge is required for this test (3.2.1.5.3.1 and 3.2.1.5.3.2 and Figure 1).
3.2.1.5.3.1 This is done by placing the tube midstream 25 mm from the nozzle. The tube size must not be varied because the densities and velocities are not uniform throughout the cross section of the discharge stream.
3.2.1.5.3.2 Adjusting the discharge dynamic head may be required. This must be done in such a way that the input flow rate as specified in 3.1.7.1 is maintained. This is done by adjusting the amount of heat transferred to the water. Increasing the heat will cause the input flow rate to change. It must be readjusted. This operation will result in an
increased dynamic pressure. To decrease it, decrease the heat and then adjust the flow (pressure).
3.2.1.6 Face Mask. Full face cover safety mask is required when performing this test.
3.2.1.7 Gloves. Gauntlet-type gloves for protection of hands are required.
3.3 Test Vehicle/Test Piece. Not applicable.
3.4 Test Time. Not applicable.
3.5 Test Required Information. Not applicable.
3.6 Personnel/Skills. Not applicable.
4 Procedure
4.1 Preparation. Not applicable.
4.2 Conditions. Not applicable.
4.2.1 Environmental Conditions. Not applicable.
4.2.2 Test Conditions. Deviations from the requirements of this standard shall have been agreed upon. Such requirements shall be specified on component drawings, test certificates, reports,etc.
4.3 Instructions.
4.3.1 Standardize the Model 100 steam generator.
4.3.1.1 Measure and maintain the input flow at
2.7 L/minute.
4.3.1.1.1 Install a 1.27 cm ( 1 / 2 in) globe valve in the steam line between coil weld assembly and hose nipple, 0.4 cm (5/32 in).
4.3.1.1.2 With burner off, engage pump and adjust globe valve until 2.7 L/minute is obtained.
4.3.1.1.3 Record the tank pressure that is obtained with the 2.7 L/minute flow rate. (This induced back pressure simulates the pressure that steam exerts on the system while the burner is on.)
4.3.1.2 Measure and maintain the mean dynamic head at 37.9 kPa.
4.3.1.2.1 Open globe valve and turn on the burner.
4.3.1.2.2 Allow tank pressure to stabilize before reading the mean dynamic head.
4.3.1.2.3 Adjustments of the dynamic head are to be made by changing the amount of heat transferred to the water at the burner. (The flow rate, as previously specified, must be maintained.)
4.3.2 Measure and record film thickness at proposed test sites per ISO 2808.
4.3.3 Immerse the parts or panels (previously prepared per engineering material specification) in the water immersion tank for 3 h at 38 2 C.Aerate the water by placing a 6.5 ram (0.25 in) ID plastic tube at the bottom of the tank and bubble
air at a rate of 1 bubble per second minimum.Maintain 5 ppm maximum dissolved solids (as NaCl) in the water. Check and record NaCl level using dissolved solids meter.
4.3.4  Remove  the  samples  after  3 h  and immediay place in freezer at -29 3 C.
4.3.5 Prepare a suitable rack to hold the test panels.
4.3.6 Following a 3 h minimum freeze cycle, remove the sample and immediay scribe an X through the coating into the substrate across the entire panel or part where feasible (Figure 2). A razor blade should be used on elastomer substrates. Mount the sample on the test rack.
4.3.7 Within 60 s from freezer removal, direct the steam blast at the scribe lines for a rain of 30 s.Angle of impingement and distance from the panel are important; care must be taken to ensure the dimensions are adhered to as follows: 45 degree
angle at a 50 to 75 mm distance (Figure 3).
4.3.7.1 High pressure wet steam represents a potential safety hazard. Not only is it necessary to secure the samples properly, but full face protection and gloves are required.
4.3.8 Remove from blast, examine, and report any loss of paint adhesion and/or any blushing (i.e., whitening, loss of gloss) and the average distance of paint adhesive loss from the scribe line.

 

 

 

   Figure 1: Measuring the Discharge Dynamic Head






  Figure 2: Scribe on Panel


 

    Figure 3: Steam Blast Impingement
5 Data
5.1 Calculations. Not applicable.
5.2 Interpretation of Results. Examine sample for any loss of paint adhesion and/or any blushing (i.e., whitening, loss of gloss) and the average distance of paint adhesive loss from the scribe line.
5.3 Test documentation. Report any loss of paint adhesion and/or any blushing (i.e., whitening, loss of gloss) and the average distance of paint
adhesive loss from the scribe line.
6 Safety
This standard may involve hazardous materials, operations, and equipment. This standard does not propose to address all the safety problems associated with its use. It is the responsibility of the user of this standard to establish appropriate safety and  health  practices  and  determine  the applicability of regulatory limitations prior to use.
7 Notes
7.1 Glossary. Not applicable.
7.2 Acronyms, Abbreviations, and Symbols. Not applicable.
8 Coding System
This standard shall be referenced in other documents, drawings, etc., as follows:
Test to GMW15919
9 Release and Revisions
9.1 Release. This standard originated in May 2008, replacing GM9525P. It was first approved by Materials Engineering in July 2009. It was first published in July 2009.


關(guān)注本網(wǎng)官方微信 隨時閱讀專業(yè)資訊

 
 
打賞
[ 新聞資訊搜索 ]  [ 加入收藏 ]  [ 告訴好友 ]  [ 打印本文 ]  [ 違規(guī)舉報 ]  [ 關(guān)閉窗口 ]
免責(zé)聲明:
本網(wǎng)站部分內(nèi)容來源于合作媒體、企業(yè)機構(gòu)、網(wǎng)友提供和互聯(lián)網(wǎng)的公開資料等,僅供參考。本網(wǎng)站對站內(nèi)所有資訊的內(nèi)容、觀點保持中立,不對內(nèi)容的準確性、可靠性或完整性提供任何明示或暗示的保證。如果有侵權(quán)等問題,請及時聯(lián)系我們,我們將在收到通知后第一時間妥善處理該部分內(nèi)容。
 

GMW15919油漆附著力熱沖擊試驗標準_91化工儀器網(wǎng)二維碼

掃掃二維碼用手機關(guān)注本條新聞報道也可關(guān)注本站官方微信賬號:"xxxxx",每日獲得互聯(lián)網(wǎng)最前沿資訊,熱點產(chǎn)品深度分析!
 

 
0相關(guān)評論

 
亚洲男人第一av网站| 性荡视频播放在线视频| 亚洲免费人成在线视频观看| 丰满少妇大力进入av亚洲| 黄瓜视频在线观看| 国产精品国产三级国av在线观看| 三年片大全在线观看免费观看大全| 日本阿v片在线播放免费| 久久久亚洲欧洲日产国码aⅴ| 亚洲一区二区女搞男| 亚洲av综合色区无码一区| 男人天堂网2017| 丰满少妇人妻无码| 欧洲美女黑人粗性暴交视频| 综合亚洲伊人午夜网| 午夜熟女插插xx免费视频| 日本韩国男男作爱gaywww| 日韩 无码 偷拍 中文字幕| 女人的精水喷出来视频| 国产av天堂亚洲国产av天堂| 又大又粗欧美黑人aaaaa片| 国产欧美亚洲精品第一页| 欧美xxxx做受欧美| 日日噜噜夜夜狠狠va视频| 国产精品乱码一区二区三区| 亚洲成av人片在线观看麦芽| 亚洲aⅴ在线无码播放毛片一线天 中国国语毛片免费观看视频 | 亚洲成av人影院| 免费操逼视频| 无套内射无矿码免费看黄| 韩国19禁无遮挡啪啪无码网站| 国产精品.xx视频.xxtv| 粉色午夜视频| 级r片内射在线视频播放| 亚欧洲精品在线视频免费观看| 免费观看全黄做爰大片| 无码人妻aⅴ一区二区三区| 久久视频在线| 男女啪啪免费体验区| 99久久久无码国产aaa精品| 久久在线视频免费观看 |